Columbus Fence Installers

Home › Areas

Fence installation in New Albany, where approval comes before the order

A fence in New Albany is two projects stacked together. There is the fence -- the line, the posts, the panels, the gates -- and there is the approval that comes first. This is a planned community, and what you add to the outside of the house is reviewed against the standards written for your neighborhood before anything is ordered. Homeowners who learn that late lose weeks, and sometimes a material order. Start there instead and you usually get the fence you pictured, on a calendar you can plan around. What follows is about that sequence, and about what long, level lots do to a fence line.

Written approval comes first, and it sets the calendar

New Albany neighborhoods run an architectural review on exterior changes, and a fence is one of them. The review is about design consistency: material, color and finish, height, style and profile, where the line sits relative to the lot lines and the street, and where the gates go. None of those answers are universal. They live in the standards written for your particular address and neighborhood, and that document decides your fence.

So the first task is not measuring. It is getting those requirements in hand, in writing, and settling whether you file the submission or the contractor does. Because the approval is written while material is expensive to be wrong about, the order waits. A half-foot of height, or a color that reads wrong against the neighbors, is cheap to change on paper and costly once it is on a truck.

What a submission usually asks you to pin down

Reviews differ from one neighborhood to the next, and yours may want more or less detail. Most turn on the same short list:

  • A drawing or marked-up plat showing the fence line and its distance from the lot lines and the street
  • The material as an actual product rather than a category -- profile, plank or picket dimension, panel system
  • The color and finish as the manufacturer names it, not as the word white
  • The height, and whether it changes anywhere along the run
  • Every gate: how many, how wide, which way each swings, and the hardware on it
  • How your line meets a neighbor's existing fence, and what happens at that transition

The look along the roads is the design expectation

Drive the main roads here and the vocabulary is obvious: white plank and post-and-rail, long and low, reading as one continuous line rather than a row of separate back yards. That is the reference point your proposal gets read against.

It has a practical effect on material choice. If what you want is a tall solid screen, expect to spend some thought reconciling the two -- often by keeping street-facing runs in the prevailing open style and putting the solid section where it faces only your own yard. Wood is the route to a real screen in any color, covered on the wood privacy fence page, and ornamental metal is the usual answer for an open line that still has to enclose something, on the aluminum fence page. Submit the real product either way: a cut sheet and a color chip get a decision, a description gets a question back.

Long runs on big, level lots change what drives the price

Lots here tend to be generous and close to flat, which mostly makes the work easier and changes the arithmetic. A long run means a lot of posts, and a post is a hole, a set, a plumb and a cure -- the labor per foot lives in the posts, not in what sits on top of them. Stretch a line to the far corners of an acre and post count moves the number more than a material upgrade does. Height, gate count and hardware, the number of corners, and whether a machine can reach the line are the other drivers. The sequence of the work is on the fence installation page.

Gate placement deserves more thought on a big lot than it gets. On a two-hundred-foot side yard, the wrong opening means walking a mower the long way around the house for years. Put one gate wide enough for equipment and one walk gate where the door and driveway are. Level ground removes an excuse too: with no steps to hide in, the top line is a straightedge across the back of the property.

Pool enclosures on the larger properties

A pool turns a fence into a safety barrier and stacks a second set of requirements on the design one. The code adopted for your address governs what a barrier has to do, and what it covers is consistent: gates that close and latch on their own, where the latch sits and which way the gate swings, how much space is allowed between vertical members, and the absence of anything a child can use as a foothold -- which is why horizontal rails and the direction a panel faces matter. The figures come from the building department, not a catalog.

The architectural review still has its own say about how the enclosure looks. Get both answers before ordering.

Matching an established street instead of standing out

On a street where the fences already read as one system, the goal is to disappear into it. The finished side faces out, toward the street and the neighbor, with posts and rails on your side. That is the expectation in a review-heavy neighborhood and the right way to build anyway. It changes the framing, so it belongs in the quote rather than in a conversation on install day.

Where your run meets a fence that is already there, someone has to decide same height or a deliberate step, one shared post or two side by side, and who owns the piece between. Have that talk with the neighbor before the submission goes in.

A sequence built around the approval

Run the steps in this order:

  1. Get the requirements for your address and neighborhood in writing, and read them before you shop
  2. Walk the line and settle footage, height, corners and gate widths; find the survey pins so the line is real rather than assumed
  3. Choose the actual product and color, and gather what the submission will ask for
  4. File it, and confirm who answers the questions that come back
  5. Wait for written approval, and order nothing until it is in hand
  6. Call 811 for utility marks once the line is fixed
  7. Order, schedule, and expect the build itself to be the short part

Fixing or replacing a fence that is already here

Older fencing here needs work eventually -- rot at the ground line, a post lifted by a winter of freezing and thawing, a gate that drags -- and those fixes are on the fence repair page. Ask early whether a like-for-like repair is treated differently from a change, because swapping a rotted wood run for vinyl in the same footprint is a change even though the line never moves. Elsewhere in the metro, see the service areas page. Send the address and a few photos of the line and we will take a look.

Common questions here

How long does architectural review take before I can start a fence?

Plan in weeks rather than days. Decisions are usually issued on a set meeting schedule instead of as submissions arrive, so timing depends on when yours lands and whether anything comes back with a question attached. One missing detail can cost a full cycle. Ask how often decisions go out, then count backward from the date you need the fence finished.

Can the fence company handle the submission for me?

Some do it routinely and some have never tried, so ask before you sign anything. Even when the contractor prepares the drawing and the product details, the homeowner is usually the one on record, so read what goes in under your name. Settle who assembles the packet, who answers questions that come back, and what a changed decision does to the price.

What happens if I build the fence before it is approved?

You risk being told to modify or remove it at your own cost, which is an expensive way to save two weeks. It also does not quietly go away: in a planned community the paperwork follows the property, and it tends to surface during a sale. A contractor who works these neighborhoods will not start without the approval in hand.

My neighbor has a fence I like. Can I build the same one?

Treat it as a starting point rather than permission. Standards get revised, so a fence approved years ago is not evidence of what passes now, and approvals are issued for one address and one set of drawings. Something about that lot -- a corner position, an easement -- may not apply to yours. Photograph it, then confirm it against your own requirements.

Do I need approval to replace a fence that is already there?

Ask before you order rather than assume. Like-for-like replacement and a change are often handled differently, and the definition of a change is broader than homeowners expect: the same footprint in a different material is a change, and so is a different height, picket profile or shade of white. Replacing a few boards is a different conversation.

Talk through your site

Start with the address, what you want done, and a few photographs of the area, including anywhere water sits after a heavy rain.

Call (614) 591-7817   or send the details

The work, by type

Elsewhere in Greater Columbus